"Moving AI off the cloud" covers two separate moves: private cloud for cost and control, and edge computing for location. Broadcom's vendor survey says 56% of large enterprises run or plan production inference on private cloud, against 41% on public cloud, and at list prices an H100 card alone equals 10,033 hours of rental at $2.99 an hour.⁠1⁠2 If a workload runs steadily most of the day, price ownership against a low-cost GPU rental before your next renewal; if measured response time fails from the nearest cloud region, test edge; otherwise stay put.

Two moves share one label

Inference means running a trained model to produce answers. Private cloud moves that work to servers you own or lease. It stays centralized. Edge computing moves it near where data is created, such as a factory or vehicle. The two solve different problems, so one business case won't cover both.

Reported Broadcom's survey covered 1,800 senior IT decision-makers at companies with 1,000 or more staff, in eight countries, in February and March 2026.⁠1 Public cloud's share of production inference fell 15 points, from 56%, by its count. The figure includes companies planning a move. Half said they had already moved some workloads, and 83% are considering it.

Broadcom sells private cloud software through VMware, so treat this as a directional signal. Its respondents cited security and compliance (51%) most often, then cost predictability and performance (39% each). Cost was the top public cloud concern at 31%.

Edge evidence is mostly forecasts and vendor surveys

ZEDEDA's survey of 600 IT and business leaders in the US and Germany, run by Censuswide from 20 to 26 February 2026, found 47% use hybrid cloud-edge setups and 24% rely mainly on centralized infrastructure.⁠3 ZEDEDA sells edge software. Its release gives no formal definition of edge, and Computer Weekly notes no third-party verification.⁠4

Analyst forecasts point the same way. Network World reports Gartner expects over two-thirds of enterprises to deploy edge AI by 2029, up from 10% in 2025, and IDC expects half of enterprise AI inference on endpoints or edge nodes by 2030.⁠5 IDC also puts edge spending at $265 billion in 2025.⁠6 Those firms sell research to this market. Forecasts don't tell you what your workload needs.

Scaling is the practical problem. In ZEDEDA's data, 41% of organizations with active deployments find distributed workloads hard to manage, and integration leads the barriers at 34%.

Who should move, and who shouldn't

Start with the workload, because company size won't decide this.

  • Consider private cloud or colocation: steady inference, predictable traffic, strict compliance needs and staff who can run GPU servers.
  • Consider edge: response time fails from the nearest region, connectivity is unreliable, or data can't leave a site.
  • Stay in public cloud: bursty demand, early experiments, small teams or models that change often.

We found no independent benchmark that sets one latency threshold for all AI work. Vendor guides quote many figures, so we don't repeat them. Measure your own 95th-percentile response time from the place the answer is used.

Ownership math starts at utilization

These figures cover a single H100 and exclude power, cooling, staff, financing, resale value and data transfer. The AWS rate is the US East (N. Virginia) on-demand price per GPU-hour, checked on 10 October 2026.⁠7 The $2.99 rate is Vultr's list price as reviewed on 23 October by Thunder Compute, a competing seller, with no region stated.⁠2 The $30,000 card is the midpoint of $25,000-$35,000 listings Spheron checked on 20 July 2026.⁠8 The $40,625 server share is $325,000 divided by 8 GPUs, the low end of a Cudo Compute estimate cited by IntuitionLabs.

Upfront cost per GPUAt $6.88/hourAt $2.99/hour
$30,000 card only4,360 hours, 182 days10,033 hours, 418 days
$40,625 server share5,905 hours, 246 days13,587 hours, 566 days

Each hours figure is upfront cost divided by hourly rate. Days assume 24-hour use. At 50% utilization, the days double.

The choice of comparison changes the answer by more than two times. A team comparing against AWS list price will see ownership pay off far sooner than one comparing against a low-cost GPU cloud. Spheron, which sells rentals, says buying makes sense above roughly 60% sustained utilization for multiple years, but it shows no full cost model.

Hyperscaler spending doesn't settle the question

Amazon, Microsoft, Alphabet and Meta guided to about $720-740 billion in 2026 capital spending, according to a summary of their third-quarter reports, and they define capital spending differently.⁠9 Some coverage reads this as proof that enterprises aren't leaving. Others read Broadcom as proof that they are.

Neither follows. Broadcom measures stated plans at surveyed enterprises, and capital spending measures what four companies are building. Neither shows how much enterprise inference has moved.

What we don't know matters here. We found no independent dataset measuring actual inference volume by location, or audited cost results from companies that moved. Treat vendor case studies as claims until you can see the utilization and staffing behind them. Past moves to on-premises infrastructure are a better planning input when they include those details.

Run these five checks before moving any AI workload

  1. Measure utilization for each inference workload over 30 days, separating steady load from peaks.
  2. Measure 95th-percentile response time from the point of use, against the nearest cloud region.
  3. Price the same workload at your current cloud rate, a low-cost GPU rate and full ownership, including power, cooling, staff and data transfer.
  4. List compliance limits on where each dataset can run, and record who approved them.
  5. Pilot one workload for one billing cycle, then compare its cost, response time and support hours with your baseline.

Revisit when AWS changes its p5 on-demand rate, or when Broadcom publishes its next Private Cloud Outlook.